Another break in this am...these guys are determined, yet there is nothing to steal.
Final review of the plans this week. There are only a few things to fine tune like hot water tanks, plumbing lines and some minor electrical items. It looks really good. While we wait for the final kitchen exhaust drawings, we can start with security upgrades and the last little bit of demolition.
Scuplinfish (our designer) has come up with a brilliant alternative for accessibility at the front of the store. The design allows for a wheelchair ramp, which also makes it easier for persons with baby buggies to enter. The other alternative was a small electric lift on the side, but I think this will look much nicer. The center of the ramp area looks like a planter, but over the long term, it will have a thick glass window that allows for a view straight down into the cheese caves.